304 stainless steel spring washer Galvanizing of carbon steel with open elastic spring washer


  • Moq:
    1 ton
  • Price:
    Please contact us
  • Package:
    Bagged/Boxed etc.
  • Export port:
    Tianjin/Qingdao/Shanghai etc.
  • Delivery date:
    15~30 days
  • Payment method:
    T/T T/C
  • Product Detail

    Product Tags

    Product Photos and Information

    Stainless Steel DIN127 Spring Washers
    Name Spring Washers Materials Carbon Steel/Stainless Steel
    Standards DIN ISO ANC BSW JIS etc. Strength level 4.8 8.8 etc.
    Size M3-M100 Surface finish ZPBLACKHDG etc.
    Length 0.8-8 Samples Available
    Stainless Steel DIN127 Spring Washers
    Stainless Steel DIN127 Spring Washers
    Stainless Steel DIN127 Spring Washers
    Stainless Steel DIN127 Spring Washers

    Product Standards

    1678862811436
    spring washers DIN 127
    Specification F3 Φ3.5 F4 F5 F6 Φ7 F8 Φ10 F12 F14 F16 F18 Φ20 F22 F24 F27
    d 1 minimum 3.1 3.6 4.1 5.1 6.1 7.1 8.1 10.2 12.2 14.2 16.2 18.2 20.2 22.5 24.5 27.5
    maximum value 3.4 3.9 4.4 5.4 6.5 7.5 8.5 10.7 12.7 14.7 17 19 21.2 23.5 25.5 28.5
    d 2 maximum value 6.2 6.7 7.6 9.2 11.8 12.8 14.8 18.1 21.1 24.1 27.4 29.4 33.6 35.9 40 43
    b Nominal 1.3 1.3 1.5 1.8 2.5 2.5 3 3.5 4 4.5 5 5 6 6 7 7
    maximum value 1.4 1.4 1.6 1.9 2.65 2.65 3.15 3.7 4.2 4.7 5.2 5.2 6.2 6.2 7.25 7.25
    minimum 1.2 1.2 1.4 1.7 2.35 2.35 2.85 3.3 3.8 4.3 4.8 4.8 5.8 5.8 6.75 6.75
    s Nominal 0.8 0.8 0.9 1.2 1.6 1.6 2 2.2 2.5 3 3.5 3.5 4 4 5 5
    maximum value 0.9 0.9 1 1.3 1.7 1.7 2.1 2.35 2.65 3.15 3.7 3.7 4.2 4.2 5.2 5.2
    minimum 0.7 0.7 0.8 1.1 1.5 1.5 1.9 2.05 2.35 2.85 3.3 3.3 3.8 3.8 4.8 4.8
    h minimum 1.9 1.9 2.1 2.7 3.6 3.6 4.6 5 5.8 6.8 7.8 7.8 8.8 8.8 11 11
    maximum value 2.1 2.2 2.5 3.2 4.2 4.2 5.4 5.9 6.8 8 9.2 9.2 10.4 10.4 13 13
    k 0.15 0.15 0.15 0.15 0.2 0.2 0.3 0.3 0.4 0.4 0.4 0.4 0.4 0.4 0.5 0.5
    r 0.2 0.2 0.2 0.2 0.3 0.3 0.5 0.5 1 1 1 1 1 1 1.6 1.6
    Thousand pieces (steel)≈kg 0.11 0.12 0.18 0.36 0.83 0.93 1.6 2.53 3.82 6.01 8.91 9.73 15.2 16.5 26.2 28.7
    Applicable thread 3 3.5 4 5 6 7 8 10 12 14 16 18 20 twenty two twenty four 27
    Specification Φ30 F36 F39 F42 F45 F48 F52 F56 Φ60 F64 F68 F72 Φ80 Φ90 Φ100
    d 1 minimum 30.5 36.5 39.5 42.5 45.5 49 53 57 61 65 69 73 81 91 101
    maximum value 31.7 37.7 40.7 43.7 46.7 50.5 54.5 58.5 62.5 66.5 70.5 74.5 82.5 92.5 102.5
    d 2 maximum value 48.2 58.2 61.2 68.2 71.2 75 83 87 91 95 99 103 111 121 131
    b Nominal 8 10 10 12 12 12 14 14 14 14 14 14 14 14 14
    maximum value 8.25 10.25 10.25 12.25 12.25 12.25 14.25 14.25 14.25 14.25 14.25 14.25 14.25 14.25 14.25
    minimum 7.75 9.75 9.75 11.75 11.75 11.75 13.75 13.75 13.75 13.75 13.75 13.75 13.75 13.75 13.75
    s Nominal 6 6 6 7 7 7 8 8 8 8 8 8 8 8 8
    maximum value 6.2 6.2 6.2 7.25 7.25 7.25 8.25 8.25 8.25 8.25 8.25 8.25 8.25 8.25 8.25
    minimum 5.8 5.8 5.8 6.75 6.75 6.75 7.75 7.75 7.75 7.75 7.75 7.75 7.75 7.75 7.75
    h 最低 13.6 13.6 13.6 15.6 15.6 15.6 18 18 18 18 18 18 18 18 18
    最大值 16.1 16.1 16.1 18.4 18.4 18.4 21.2 21.2 21.2 21.2 21.2 21.2 21.2 21.2 21.2
    k 0.8 0.8 0.8 0.8 0.8 0.8 1 1 1 1 1 1 1 1 1
    r 1.6 1.6 1.6 2 2 2 2 2 2 2 2 2 2 2 2
    千件(钢)≈公斤 44.3 67.3 71.7 111 117 123 182 193 203 218 228 240 262 290 318
    适用螺纹 30 36 39 42 45 48 52 56 60 64 68 72 80 90 100

    About Us

    Dabang Fasteners is a wholly-owned subsidiary of Hebei Chengyi Engineering Materials Co., Ltd.
    Our parent company has 21 years experience in fastener production and is ISO9001 ISO14001 ISO45001 SGS certified.
    We focus on providing customers with competitive products that meet user needs.
    --- Factory price, saving 15-30% of the middleman price difference.
    --- exporting to 154 countries, accumulatively serving 1800+ customers, rich export experience
    --- 5000 tons in stock, up to 3000 tons per month, average delivery time 7-20 days.
    --- After-sales team of 25 people, solve all after-sales problems

    0 Risk Commitment
    --- If the product quality and packaging problems are found after receiving the goods,
    help solve the problem and unconditionally compensate the loss within 30 days.

    Our added value
    --- In China, provide you with free factory inspection services.

    about_us2

    Factory Introduction

    factory1

    Production Process

    process21

    Packing and Shipping

    Packing1

    Certificate

    certificate1

    Exhibition/partner Photos

    Exhibition

  • Previous:
  • Next: